Precast Concrete
Large-span tandem lifting solutions for precast beam and concrete component yards.

Challenges & Our Solutions
The precast concrete industry requires cranes that can handle extra-long and heavy components with millimeter-level synchronization. Our tandem lifting gantry cranes are specifically designed for precast yards, bridge beam storage, and concrete component production lines.
Industry Challenges
Handling precast beams exceeding 40 meters in length, requiring absolute synchronicity between multiple cranes, and operating in outdoor storage yards with varying weather conditions.
Our Solution
Our tandem lift control system enables two cranes to operate as one, with real-time load sharing and position synchronization. The wide-span design accommodates multiple storage lanes for maximum yard utilization.
Equipment for This Industry
These product families are commonly evaluated for this industry. Final selection depends on capacity, span, duty, environment, site interfaces, and applicable standards.
Reference Configurations
Representative engineering scenarios for early-stage planning. These are not presented as documented customer deliveries; review the published project cases for formal case records.
Long Beam Tandem Handling
Two synchronized gantry cranes can be evaluated for long precast components with load sharing, travel coordination, wind limits, and a project-specific lifting plan.
Box Girder Yard Handling
A gantry crane with a purpose-designed spreader can be reviewed around girder geometry, center of gravity, yard lanes, lifting points, and outdoor conditions.
Industry Questions
What crane solution fits Precast Concrete projects?+
Our tandem lift control system enables two cranes to operate as one, with real-time load sharing and position synchronization. The wide-span design accommodates multiple storage lanes for maximum yard utilization. Recommended equipment can be reviewed against load size, working frequency, operating environment, and site layout.
What challenges should be considered in Precast Concrete?+
Handling precast beams exceeding 40 meters in length, requiring absolute synchronicity between multiple cranes, and operating in outdoor storage yards with varying weather conditions.
Which HAOKCRANES products are recommended for Precast Concrete?+
Recommended products include MH Single Girder Gantry Crane, Double Girder Gantry Crane. The final model should be matched to lifting capacity, span or working range, lifting height, and installation conditions.
Can the crane configuration be adapted to our industry?+
Project-specific configurations can be reviewed around your operating conditions, material characteristics, duty requirements, building interfaces, local standards, and production process. Final suitability is confirmed through technical review.
How is the project schedule confirmed?+
The production and delivery schedule is confirmed after the crane specification, drawings, customization scope, documentation, destination, and commercial terms are agreed.
Get an Industry-Specific Solution
Submit your requirements for an initial technical review covering crane type, duty, operating environment, site interfaces, and required documentation.
